The charging process is straightforward for most drivers. However, the exact screen prompts and payment process depend on the charger configuration and the charging operator.
Step 1: Check the Payment Options
When you arrive at the station, check the available payment and activation methods. Common options include:
QR-code payment: Scan the displayed code using the supported payment service.
POS terminal: Pay using a supported bank card or payment card.
RFID card: Tap an authorized charging card, if enabled.
PIN or password activation: Enter the required code, if supported.
QR-code and POS payments are common options at public charging stations, but availability varies by market and operator.
Step 2: Connect the Charging Connector
Park safely and check that the connector matches your vehicle’s DC charging inlet.
Remove the connector from its holder and insert it fully into the vehicle’s charging port. The vehicle and charger will then perform communication and safety checks before charging begins.
Do not force the connector. If the charger or vehicle displays an error, follow the on-screen instructions.
Step 3: Select the Start Method
Follow the instructions on the charger’s display. Depending on the system, you may need to scan a QR code, complete payment, tap an RFID card, or enter an activation code.
Some systems require payment authorization before charging can start. Others may verify payment after the connector has been connected. Follow the sequence shown on the specific charger.
Step 4: Confirm Payment and Start Charging
Some charging platforms require a prepaid amount or temporary payment authorization before a session begins.
If prepayment is used, the final charge should be calculated according to the operator’s billing rules. Any unused balance should be refunded or released according to the payment provider’s process.
Once authorization and vehicle communication are complete, charging will start. Check the display for charging status, delivered energy, elapsed time, and any available cost information.
Note: A 160kW charger does not guarantee that every vehicle will charge at 160kW. Actual charging power depends on the vehicle’s maximum DC charging capability, battery state of charge, battery temperature, and the charger’s available power.
Step 5: Finish Charging and Return the Connector
When charging is complete, stop the session using the vehicle, charger screen, or payment system as instructed.
Wait for the connector lock to release, then carefully remove the connector and return it to its holder. Do not pull the cable forcefully or leave the connector on the ground.
Returning the connector properly helps prevent cable damage, connector contamination, and unnecessary wear, supporting safer and more reliable station operation.
3. How Deedian Supports DC Charging Projects
Choosing the right DC charger involves more than comparing rated power. Installers and operators also need dependable technical documentation, commissioning support, and a charging system that fits their site requirements.
Deedian offers floor-standing DC charging solutions in the 60–160kW range for commercial and fleet applications. Depending on the selected model and project requirements, our team can assist with:
Product selection based on site power and application.
Input cable and electrical installation documentation.
OCPP configuration support before shipment.
Charging platform and pricing setup guidance.
Technical communication during installation and commissioning.
For a suitable configuration, provide your target charger power, local supply voltage and frequency, connector type, cable distance, and intended application.
Planning a 60–160kW DC charging project?
Contact Deedian to discuss charger specifications, installation requirements, OCPP compatibility, and OEM/ODM options for your market.
Frequently Asked Questions
What transformer capacity is needed for a 120kW DC charger?
Using a preliminary sizing factor of 0.8, a 120kW charger corresponds to approximately 150kVA. The final transformer capacity must be confirmed using the charger’s actual electrical data, other site loads, and local engineering requirements.
Does a 60–160kW DC charger require three-phase 380V power?
The Deedian models covered by this guide are planned around three-phase 380V AC input, subject to the exact model specification. Always verify the product datasheet before installation.
Can Deedian configure OCPP before shipment?
Yes. Deedian can assist with pre-shipment OCPP configuration when the necessary platform details and configuration requirements are supplied in advance. Compatibility should be confirmed with the selected management platform.
Why does my vehicle charge below 160kW?
The charger’s rated power is its maximum capability, not a guaranteed charging speed. Vehicle limits, battery temperature, state of charge, and available site power can all reduce actual charging power.
How should I protect the charging connector after use?
Stop the charging session correctly, wait for the connector to unlock, remove it without pulling the cable, and return it securely to the holder. This helps protect the connector and cable from avoidable damage.



